Close search
The CMPS2000 vertical shaft high-speed mixer was specifically designed to address the aforementioned challenges. It features targeted upgrades based on mature vertical shaft planetary mixing technology.

European UHPC Premix Production Line | 2m³ Planetary Concrete Mixer
Powerful Drive and Durable Design for Continuous Production: The equipment is powered by a robust 132kW motor to ensure efficient mixing. Additionally, key components utilize high-strength, wear-resistant materials capable of withstanding the intense abrasion associated with UHPC mixing, thereby guaranteeing stability and longevity during prolonged, high-load operations.
Production Line Application: How the UHPC Premix Line Empowers Wind Power Tower Segment Production

2m³ Planetary Concrete Mixer for Wind Power Tower Segment Production
From precise batching to efficient mixing, CO-NELE helps you achieve standardized, large-scale production of UHPC premix.Ensuring UHPC Material Performance: Through efficient and highly homogeneous mixing, the CMPS2000 concrete mixer ensures the thorough blending of ultrafine powders, admixtures, and water. Meanwhile, the high-speed chopper guarantees uniform steel fiber dispersion, directly enhancing the tensile strength and toughness of the tower segments.
Matching the production line cycle: The production of hybrid wind turbine tower segments follows a rigorous eight-step assembly line process. As the core of the premix production line, the CMPS2000 UHPC mixer—featuring a large 2-cubic-meter (2000L) capacity and efficient batch mixing capabilities—reliably and promptly supplies high-quality UHPC premix to downstream casting operations, ensuring the efficient flow of the entire production line.
Enhancing component quality and structural safety: UHPC segments produced using the CMPS2000 planetary concrete mixer exhibit high strength, high density, and excellent resistance to environmental erosion. These properties significantly improve the stability and safety of wind turbine towers, enabling them to better withstand the extreme operating conditions found in both onshore and offshore wind farms.We will contact you within 24 hours.